Tech Meeting Minutes 20101118
From ScotGrid
Present: Graeme, Sam, Mark, David, Peter, Wahid, Andy
http://indico.cern.ch/conferenceDisplay.py?confId=114026
Backlink: http://www.scotgrid.ac.uk/wiki/index.php/ScotGrid_Technical_Meetings
[edit]
Site by Site...
- ECDF
- ATLAS squid/frontier test failing for 2.5 days. Wahid not sure why this might be but maybe a network issue (new IP range?).
- ACTION: Wahid to investigate immediate failures. Update: Wahid discovered that the local/setup.sh file was empty at ECDF. Might need a new s/w area...
- ACTION: Medium term, setup ECDF's own squid.
- Disk: Now commissioned, but not in ATLAS space tokens. Wahid will deploy it into space tokens next week, then we can enable PD2P for ECDF and and ask for a data share.
- Should run HCs to scale test site and support request for data to be moved here.
- Will need to ensure that pilots can run (better CE infrastructure!) and that analysis pilots get priority. ACTION.
- CREAM: Should work, needs tested. Graeme can send hobbled pilots. ACTION.
- ATLAS squid/frontier test failing for 2.5 days. Wahid not sure why this might be but maybe a network issue (new IP range?).
- Durham
- Durham not appearing in the 'GRIDPP' grid - needs added to the BDII. ACTION. (Wahid posted some notes in the chat window.)
- Peter is keen to look at CREAM, but there is no promise it will be done by the end of the year.
- Glasgow
- Now in the final stages of commissioning 10 new disk servers. Should be online next week.
- glite-APEL upgrade should be done in the coming week.
- svr026 is being drained to reinstall as a CREAM CE.
[edit]
AOB
- Peter to send skype ID, but has trouble running skype on his current RHEL laptop.
- ScotGrid Technical F2F will be on Friday 14 January.
- Next meeting Thursday 25th November, 1100. http://indico.cern.ch/conferenceDisplay.py?confId=114094.
