Tech Meeting Minutes 20121406

From ScotGrid

Table of contents

14/06/2012

Present: Sam, Gareth, Andy, Mike, Dave (chair & minutes)

Durham

SE real problem. Thought this was sorted, seems to have fallen over again.

Hardware damage after power cut

power supplies in worker nodes
some disk servers

Corrective actions

Temperature sensors to autoshutdown workers have been deployed and tested
There have now been meetings discussing adding the chiller to the backup generator
The power being used now is an alternate feed. There will be another downtime when the feed has to be switched back
Need A/C in room with UPS

Edinburgh

Nothing to report, Andy's getting caught back up

Glasgow

Hot spots still in evidence, transition from SL4-SL5 almost complete which can be followed by file rebalancing.