Glasgow site Change Control
From ScotGrid
(Difference between revisions)
| Revision as of 10:37, 26 Jun 2012 Gareth roy (Talk | contribs) ← Go to previous diff |
Revision as of 10:37, 26 Jun 2012 Gareth roy (Talk | contribs) Proposed Change Control Go to next diff → |
||
| Line 1: | Line 1: | ||
| - | == Proposed Change Control == | ||
| - | |||
| {| border="1" | {| border="1" | ||
| |- | |- | ||
Revision as of 10:37, 26 Jun 2012
| Date | Description | Affected | Details |
|---|---|---|---|
| 2012-06-26 | Initial test bonding of the ethernet interfaces on a SandyBridge worker node. | node071, 141 Access (08) | CC-2012-06-26-1 |
