Tech Meeting Minutes 20110707
From ScotGrid
Present: Andy, Wahid, Sam, Dave, Stuart and Mark
Apologies: Mike
https://indico.cern.ch/conferenceDisplay.py?confId=138128
| Table of contents |
Overview
Durham, Peter Grandi has no left IPPP at Durham
Edinburgh have another gold star for no tickets
Glasgow on going SARA fault outstanding. Network QOS upgrade.
Durham
CREAM CE Testing completed
Remote Access functioning correctly
---
ECDF
Whole node Scheduling ready for testing
Cream error resolved by A Washbrook
Broker off for analysis causing issues with Hammer Cloud tests
---
Glasgow
Sam reported new cabling and associated switch port issue
CVMFS Install ongoing
Dave Crooks QOS enabalement for Server016 has made a big different to the performance of both Torque and Maui.
New Server 016 to installed in 243d and testing to be conducted from the 19th of July
---
AOB
Durham staff changes discussed Robert Harrington to join the team at Edinburgh
-
---
